Public record
The project record
Completed public works projects for cities, townships, schools, and colleges, plus permitted projects from Genesee County building filings. Click any project with an arrow to see the owner, the timeframe, and exactly what the work included. We would rather show you the record than tell you a story.
01Project record
- 2026Public
Campus sidewalk, curb, and stair concrete program
Mott Community College, Flint
2026Campus sidewalk, curb, and stair concrete programMott Community College, FlintPublicOwnerMott Community CollegeLocationMain campus, 1401 E Court St, Flint, MI 48503TimeframeMay to August 2026Site conditionsOne-lane closure of Court Street required to complete the work.Concrete sidewalk, curb, pad, curb ramp openings, concrete stairs, and trip-hazard replacement and repair for ADA and campus safety before fall semester.
What the work included
- Saw-cut, remove, and replace damaged sidewalks, curbs, pads, curb ramp openings, and walk-up steps
- Pour 5-inch, 4000 psi air-entrained concrete sidewalk on compacted aggregate with welded-wire reinforcement
- Repair MDOT-style concrete curb with reinforcing bars
- Finish with medium broom and tooled edges
- Correct trip hazards and restore damaged landscaping
- Barricade completed work on an occupied campus
- Maintain one-lane traffic control on Court Street during adjacent concrete work
- 2026Public
City Hall sidewalk replacement, 5,625 square feet
Flint City Hall, Flint
2026City Hall sidewalk replacement, 5,625 square feetFlint City Hall, FlintPublicOwnerCity of FlintLocationFlint City Hall, 1101 S Saginaw St, Flint, MI 48502Timeframe2026Remove and replace 5,625 square feet of deteriorated sidewalk at City Hall, including the "Back Forty" area behind Police and Fire.
What the work included
- Saw-cut and remove marked sidewalk squares
- Prepare grade and compact 23A sub-base
- Pour new 6-inch concrete sidewalk at the Back Forty
- Install expansion and control joints
- Broom-finish and edge the new walks
- Backfill, place topsoil, seed, fertilize, and restore lawn
- 2024-26Public
Citywide seasonal speed hump program, about 175 units
Local streets, Flint
2024-26Citywide seasonal speed hump program, about 175 unitsLocal streets, FlintPublicOwnerCity of Flint, Department of Public WorksLocationLocal streets across the City of Flint, MITimeframeApril through November, 2024 to 2026Seasonal installation, maintenance, and removal of approximately 175 curb-to-curb speed humps on local roads.
What the work included
- Pick up city-owned speed hump sections from the city yard
- Install humps curb to curb with end caps, mid-sections, and lag bolts
- Set city-provided signs and posts where required
- Maintain units during the season, including loose bolts and service calls
- Remove humps in November and return them to the city yard
- 2025Public
Campus flatwork at three Mott campuses
Mott Community College, Flint, Fenton, Lapeer
2025Campus flatwork at three Mott campusesMott Community College, Flint, Fenton, LapeerPublicOwnerMott Community CollegeLocationMain campus, 1401 E Court St, Flint, MI; Southern Lakes Branch Center, Fenton, MI; Lapeer Extension Center, Lapeer, MITimeframeMay to September 2025Concrete sidewalk, curb, pad, curb ramp openings, concrete stairs, and trip-hazard replacement and repair at Mott campuses in Flint, Fenton, and Lapeer.
What the work included
- Remove and replace sidewalk flags, pads and slabs, curbs, curb ramp openings, concrete stairs, and walk-up steps
- Pour 5-inch, 4000 psi air-entrained concrete sidewalk on compacted aggregate with welded-wire reinforcement
- Repair MDOT-style concrete curb with reinforcing bars
- Correct trip hazards
- Restore damaged landscaping and barricade completed work on an occupied campus
- 2025Public
Clubhouse basement moisture control and building repairs
Mott Park Clubhouse, Flint
2025Clubhouse basement moisture control and building repairsMott Park Clubhouse, FlintPublicOwnerCity of FlintLocationMott Park Clubhouse, 2401 Nolen Dr, Flint, MI 48504Timeframe2025Basement moisture control, mold remediation, ceiling and patio sealing, and mini-split installation at the Mott Park Clubhouse.
What the work included
- Inspect basement walls for cracks and water penetration
- Inspect and treat steel beams
- Repair cracks and holes in the ceiling
- Apply water-resistant sealant at the patio
- Install drip edge and flashing around the patio
- Inspect for mold, clean affected areas, and apply anti-mold, moisture-resistant paint
- Install an average of 4 inches of spray foam on the steel-deck ceiling
- Install a mini-split with required piping and electrical
- 2025Public
20' x 20' building addition and interior improvements
Krapohl Senior Center, Mount Morris
202520' x 20' building addition and interior improvementsKrapohl Senior Center, Mount MorrisPublicOwnerCharter Township of Mount MorrisLocationKrapohl Senior Center, G-5447 Bicentennial Dr, Mount Morris, MI 48458TimeframeJune to December 202520' x 20' storage addition and interior and HVAC improvements at the senior center.
What the work included
- Build a 20' x 20' addition on the east side, including footings, concrete floor, entry, drywall, paint, electrical, heating, and lighting
- Install new ceiling tiles throughout the center, paint metal grids, and replace light covers
- Reconnect HVAC and install foam insulation at the rear office exterior walls
- Complete required site restoration and soil-erosion controls
- 2024-25Public
50/50 residential sidewalk replacement program
Residential streets, Flint
2024-2550/50 residential sidewalk replacement programResidential streets, FlintPublicOwnerCity of FlintLocationResidential sidewalks across the City of Flint, MITimeframe2024 to 2025 construction seasonsRemove and replace residential concrete sidewalk under the City of Flint 50/50 program.
What the work included
- Remove failed sidewalk squares at participating residential properties
- Form, pour, and finish new 4-inch and 6-inch concrete sidewalk
- Install ADA ramps where required
- Replace sidewalk around trees where specified
- Restore work areas and leave squares ready for City inspection
- 2024Public
Loading dock wall, dumpster pad, and stair reconstruction
Clio Area High School, Clio
2024Loading dock wall, dumpster pad, and stair reconstructionClio Area High School, ClioPublicOwnerClio Area SchoolsLocationClio Area High School, 1 Mustang Dr, Clio, MI 48420TimeframeJune 14 to 30, 2024Loading dock wall, dumpster pad, and interior stair reconstruction.
What the work included
- Demolition of existing paving, brick wall, stairs, and concrete wall at the dock
- New 12-inch-thick, 6-foot-tall reinforced concrete dock wall tied to the existing footing
- Form and pour reinforced concrete stairs to the existing profile
- New embed angle at the dock edge
- New 10' x 10' x 8-inch reinforced dumpster pad
- Remove and replace concrete in metal pan stairs and replace stair pans
- 2024Public
District-wide concrete sidewalk replacement
District school sites, Yale
2024District-wide concrete sidewalk replacementDistrict school sites, YalePublicOwnerYale Public SchoolsLocationMultiple school sites, Yale Public Schools, Yale, MITimeframeSummer 2024Remove and replace approximately 1,851 square feet of concrete sidewalk at marked locations at district schools.
What the work included
- Remove existing marked sidewalk slabs
- Prepare base and haul off earth and debris
- Pour 6-inch concrete sidewalk reinforced with rebar and tied into existing walks
- Reseed and restore disturbed areas
- 2023Public
Water treatment plant concrete repairs
Midland Water Treatment Plant, Midland
2023Water treatment plant concrete repairsMidland Water Treatment Plant, MidlandPublicOwnerCity of MidlandLocationMidland Water Treatment Plant, 2125 Austin St, Midland, MITimeframe2023Exterior concrete repair and replacement at three locations: culvert headwall, east and west stairs, and outfall wing walls.
What the work included
- Saw-cut, demo, and replace the damaged culvert headwall; drill and epoxy #4 rebar; backfill with compacted MDOT Class II sand and restore slopes
- Repair east and west exterior stairs: replace abutment wall, patch spalls, add expansion joint, reinforce with epoxied #4 rebar, and refinish the existing handrail
- Remove timber outfall barrier walls and pour new frost-depth footings and cast-in-place concrete wing walls with rebar, expansion joints, and waterproofing
- Dispose of rubble and restore disturbed areas with topsoil, seed, and mulch
- 2021Public
Concrete pad, sidewalk, and glass transit shelter
3500 Flushing Rd, Flint
2021Concrete pad, sidewalk, and glass transit shelter3500 Flushing Rd, FlintPublic - 2020Public
Enclosed transit shelter
3243 Mallery St, Flint
2020Enclosed transit shelter3243 Mallery St, FlintPublic - 2019Residential
Foundation for 24' x 32' detached garage
4024 E Atherton Rd, Burton
2019Foundation for 24' x 32' detached garage4024 E Atherton Rd, BurtonResidential - 2019Residential
Inground pool demolition
8384 Fenton Rd, Grand Blanc
2019Inground pool demolition8384 Fenton Rd, Grand BlancResidential - 2018Public
Slab structure and sidewalks, transit shelter
3515 Miller Rd, Flint
2018Slab structure and sidewalks, transit shelter3515 Miller Rd, FlintPublic - 2018Public
Slab structure and sidewalk, transit shelter
2469 S Linden Rd, Flint
2018Slab structure and sidewalk, transit shelter2469 S Linden Rd, FlintPublic - 2018Public
Slab structure and sidewalks, transit shelter
1261 W Bristol Rd, Flint
2018Slab structure and sidewalks, transit shelter1261 W Bristol Rd, FlintPublic
Permit entries from Genesee County building permit filings. Detailed project descriptions provided by Better 2 Enterprises.
Photography of our own completed work is coming. Until then, this page stays photo-free on purpose: the permit record above is verified public history, and we will not dress it up with pictures of someone else's concrete.
Your project could be the next entry
Call (810) 493-3521 or send the form. Whether it is a bus shelter pad or a backyard patio, it starts with a conversation.