The project record

Completed public works projects for cities, townships, schools, and colleges, plus permitted projects from Genesee County building filings. Click any project with an arrow to see the owner, the timeframe, and exactly what the work included. We would rather show you the record than tell you a story.

01Project record

  • 2026Public

    Campus sidewalk, curb, and stair concrete program

    Mott Community College, Flint

    OwnerMott Community College
    LocationMain campus, 1401 E Court St, Flint, MI 48503
    TimeframeMay to August 2026
    Site conditionsOne-lane closure of Court Street required to complete the work.

    Concrete sidewalk, curb, pad, curb ramp openings, concrete stairs, and trip-hazard replacement and repair for ADA and campus safety before fall semester.

    What the work included

    • Saw-cut, remove, and replace damaged sidewalks, curbs, pads, curb ramp openings, and walk-up steps
    • Pour 5-inch, 4000 psi air-entrained concrete sidewalk on compacted aggregate with welded-wire reinforcement
    • Repair MDOT-style concrete curb with reinforcing bars
    • Finish with medium broom and tooled edges
    • Correct trip hazards and restore damaged landscaping
    • Barricade completed work on an occupied campus
    • Maintain one-lane traffic control on Court Street during adjacent concrete work
  • 2026Public

    City Hall sidewalk replacement, 5,625 square feet

    Flint City Hall, Flint

    OwnerCity of Flint
    LocationFlint City Hall, 1101 S Saginaw St, Flint, MI 48502
    Timeframe2026

    Remove and replace 5,625 square feet of deteriorated sidewalk at City Hall, including the "Back Forty" area behind Police and Fire.

    What the work included

    • Saw-cut and remove marked sidewalk squares
    • Prepare grade and compact 23A sub-base
    • Pour new 6-inch concrete sidewalk at the Back Forty
    • Install expansion and control joints
    • Broom-finish and edge the new walks
    • Backfill, place topsoil, seed, fertilize, and restore lawn
  • 2024-26Public

    Citywide seasonal speed hump program, about 175 units

    Local streets, Flint

    OwnerCity of Flint, Department of Public Works
    LocationLocal streets across the City of Flint, MI
    TimeframeApril through November, 2024 to 2026

    Seasonal installation, maintenance, and removal of approximately 175 curb-to-curb speed humps on local roads.

    What the work included

    • Pick up city-owned speed hump sections from the city yard
    • Install humps curb to curb with end caps, mid-sections, and lag bolts
    • Set city-provided signs and posts where required
    • Maintain units during the season, including loose bolts and service calls
    • Remove humps in November and return them to the city yard
  • 2025Public

    Campus flatwork at three Mott campuses

    Mott Community College, Flint, Fenton, Lapeer

    OwnerMott Community College
    LocationMain campus, 1401 E Court St, Flint, MI; Southern Lakes Branch Center, Fenton, MI; Lapeer Extension Center, Lapeer, MI
    TimeframeMay to September 2025

    Concrete sidewalk, curb, pad, curb ramp openings, concrete stairs, and trip-hazard replacement and repair at Mott campuses in Flint, Fenton, and Lapeer.

    What the work included

    • Remove and replace sidewalk flags, pads and slabs, curbs, curb ramp openings, concrete stairs, and walk-up steps
    • Pour 5-inch, 4000 psi air-entrained concrete sidewalk on compacted aggregate with welded-wire reinforcement
    • Repair MDOT-style concrete curb with reinforcing bars
    • Correct trip hazards
    • Restore damaged landscaping and barricade completed work on an occupied campus
  • 2025Public

    Clubhouse basement moisture control and building repairs

    Mott Park Clubhouse, Flint

    OwnerCity of Flint
    LocationMott Park Clubhouse, 2401 Nolen Dr, Flint, MI 48504
    Timeframe2025

    Basement moisture control, mold remediation, ceiling and patio sealing, and mini-split installation at the Mott Park Clubhouse.

    What the work included

    • Inspect basement walls for cracks and water penetration
    • Inspect and treat steel beams
    • Repair cracks and holes in the ceiling
    • Apply water-resistant sealant at the patio
    • Install drip edge and flashing around the patio
    • Inspect for mold, clean affected areas, and apply anti-mold, moisture-resistant paint
    • Install an average of 4 inches of spray foam on the steel-deck ceiling
    • Install a mini-split with required piping and electrical
  • 2025Public

    20' x 20' building addition and interior improvements

    Krapohl Senior Center, Mount Morris

    OwnerCharter Township of Mount Morris
    LocationKrapohl Senior Center, G-5447 Bicentennial Dr, Mount Morris, MI 48458
    TimeframeJune to December 2025

    20' x 20' storage addition and interior and HVAC improvements at the senior center.

    What the work included

    • Build a 20' x 20' addition on the east side, including footings, concrete floor, entry, drywall, paint, electrical, heating, and lighting
    • Install new ceiling tiles throughout the center, paint metal grids, and replace light covers
    • Reconnect HVAC and install foam insulation at the rear office exterior walls
    • Complete required site restoration and soil-erosion controls
  • 2024-25Public

    50/50 residential sidewalk replacement program

    Residential streets, Flint

    OwnerCity of Flint
    LocationResidential sidewalks across the City of Flint, MI
    Timeframe2024 to 2025 construction seasons

    Remove and replace residential concrete sidewalk under the City of Flint 50/50 program.

    What the work included

    • Remove failed sidewalk squares at participating residential properties
    • Form, pour, and finish new 4-inch and 6-inch concrete sidewalk
    • Install ADA ramps where required
    • Replace sidewalk around trees where specified
    • Restore work areas and leave squares ready for City inspection
  • 2024Public

    Loading dock wall, dumpster pad, and stair reconstruction

    Clio Area High School, Clio

    OwnerClio Area Schools
    LocationClio Area High School, 1 Mustang Dr, Clio, MI 48420
    TimeframeJune 14 to 30, 2024

    Loading dock wall, dumpster pad, and interior stair reconstruction.

    What the work included

    • Demolition of existing paving, brick wall, stairs, and concrete wall at the dock
    • New 12-inch-thick, 6-foot-tall reinforced concrete dock wall tied to the existing footing
    • Form and pour reinforced concrete stairs to the existing profile
    • New embed angle at the dock edge
    • New 10' x 10' x 8-inch reinforced dumpster pad
    • Remove and replace concrete in metal pan stairs and replace stair pans
  • 2024Public

    District-wide concrete sidewalk replacement

    District school sites, Yale

    OwnerYale Public Schools
    LocationMultiple school sites, Yale Public Schools, Yale, MI
    TimeframeSummer 2024

    Remove and replace approximately 1,851 square feet of concrete sidewalk at marked locations at district schools.

    What the work included

    • Remove existing marked sidewalk slabs
    • Prepare base and haul off earth and debris
    • Pour 6-inch concrete sidewalk reinforced with rebar and tied into existing walks
    • Reseed and restore disturbed areas
  • 2023Public

    Water treatment plant concrete repairs

    Midland Water Treatment Plant, Midland

    OwnerCity of Midland
    LocationMidland Water Treatment Plant, 2125 Austin St, Midland, MI
    Timeframe2023

    Exterior concrete repair and replacement at three locations: culvert headwall, east and west stairs, and outfall wing walls.

    What the work included

    • Saw-cut, demo, and replace the damaged culvert headwall; drill and epoxy #4 rebar; backfill with compacted MDOT Class II sand and restore slopes
    • Repair east and west exterior stairs: replace abutment wall, patch spalls, add expansion joint, reinforce with epoxied #4 rebar, and refinish the existing handrail
    • Remove timber outfall barrier walls and pour new frost-depth footings and cast-in-place concrete wing walls with rebar, expansion joints, and waterproofing
    • Dispose of rubble and restore disturbed areas with topsoil, seed, and mulch
  • 2021Public

    Concrete pad, sidewalk, and glass transit shelter

    3500 Flushing Rd, Flint

  • 2020Public

    Enclosed transit shelter

    3243 Mallery St, Flint

  • 2019Residential

    Foundation for 24' x 32' detached garage

    4024 E Atherton Rd, Burton

  • 2019Residential

    Inground pool demolition

    8384 Fenton Rd, Grand Blanc

  • 2018Public

    Slab structure and sidewalks, transit shelter

    3515 Miller Rd, Flint

  • 2018Public

    Slab structure and sidewalk, transit shelter

    2469 S Linden Rd, Flint

  • 2018Public

    Slab structure and sidewalks, transit shelter

    1261 W Bristol Rd, Flint

Permit entries from Genesee County building permit filings. Detailed project descriptions provided by Better 2 Enterprises.

Photography of our own completed work is coming. Until then, this page stays photo-free on purpose: the permit record above is verified public history, and we will not dress it up with pictures of someone else's concrete.

Your project could be the next entry

Call (810) 493-3521 or send the form. Whether it is a bus shelter pad or a backyard patio, it starts with a conversation.